The Call Out concept replaces a Reserve/Standby activity with a Call out activity if you assign flights that overlap the Reserve/Standby activity.
You will need to create a Call Out activity Reserve or Standby.
| Field | Description | 
| Data Type | Select Human Resource. | 
| Default | Select the checkbox. | 
| Start Time | Leave blank. | 
| End Time | Leave blank. | 
| Default Length | Leave blank. | 
When you drag the flights down on the reference activity, the original activity is replaced with the adjusted Call Out activity.
Note: The Type replaces the same Type (standby replaces a standby, reserve replaces a reserve).

