The Call Out concept replaces a Reserve/Standby activity with a Call out activity if you assign flights that overlap the Reserve/Standby activity.
You will need to create a Call Out activity Reserve or Standby.
Field | Description |
Data Type | Select Human Resource. |
Default | Select the checkbox. |
Start Time | Leave blank. |
End Time | Leave blank. |
Default Length | Leave blank. |
When you drag the flights down on the reference activity, the original activity is replaced with the adjusted Call Out activity.
Note: The Type replaces the same Type (standby replaces a standby, reserve replaces a reserve).